- Location
- somewhere
I screwed up a bit, I got so used to the idea of having completed T2 LR Sensors for part purposes that I completely forgot that the "Starbase sensor tech" Generic team 1 is currently researching technically still is the same project, and required not only to unlock 2320s Sensor Installations and 2320s High-Powered Sensor Arrays, but also to unlock 2320s Long-Range Sensors (unless @OneirosTheWriter wants to make an exception).
Still, it should be fine, we can just put the new sensor team on Anti-Cloaking Sensors (which I was going to advocate putting a second new sensor team on if we had gotten one) and recruit a new sensor team in 2319. Assuming we are willing to substitute that team with Spock in 2321 we'd still have T3 LR and Nav sensors available in 2323 (assuming the new team to be skill 2, Eaton to stay in her current position throughout and one boost, other combinations also possible). As each team would be researching for 2 years and Spock finishing his current project first and then switching to this project as soon as he is available this does not look very much like the undesired "swapping in a finisher" and could be considered acceptable.
If we don't consider moving teams out of a project acceptable T3 LR and Nav sensors would seem to have been impossible to have available in 2323 all along, unless we are willing to keep the VSA idle for a year.
Still, it should be fine, we can just put the new sensor team on Anti-Cloaking Sensors (which I was going to advocate putting a second new sensor team on if we had gotten one) and recruit a new sensor team in 2319. Assuming we are willing to substitute that team with Spock in 2321 we'd still have T3 LR and Nav sensors available in 2323 (assuming the new team to be skill 2, Eaton to stay in her current position throughout and one boost, other combinations also possible). As each team would be researching for 2 years and Spock finishing his current project first and then switching to this project as soon as he is available this does not look very much like the undesired "swapping in a finisher" and could be considered acceptable.
If we don't consider moving teams out of a project acceptable T3 LR and Nav sensors would seem to have been impossible to have available in 2323 all along, unless we are willing to keep the VSA idle for a year.
Last edited: