Results
[X][Carter]Build Tiberium Processing Stage 1 69/100
While experience has been gained, assembly of the first stage of processing plants has been slow. Adding to that the wrong type of bolts has been ordered and getting hold of the right kind has been difficult with the current shortage of capital goods.
[X][Carter]Build Part Fabrication Plant Stage 1 72/100
In the contest of who could finish the building faster, the fabrication plant group lost, a few minor setbacks with the cement mixers and general disorganisation meant their progress was slower than expected.
[X][Carter]Build Assembly Plant Stage 1 146/100 Finished
The assembly plant group meanwhile showed their true colors, assembling the prefabricated building in no time and starting with the installation of the various assembly machines. Their gloating has led to a few shouting matches in the mess hall, but the conflicts have remained nonviolent.
[X][Carter]Acquire Coffee Machine 89 vs DC 40, Success
Carter came out successful in the inter department fight over the remaining prototypes, narrowly taking it under the nose of the GDI air force. This has led to a few angry mails from the other branches, ranging from sarcastic declarations of rivalry to ones that are subject to internal investigation.
[X][Carter]Acquire Construction Vehicles 194/400
Carter has found him, the one is who knows where the lost vehicles are. The problem: the man is 88 and can't remember. Not giving up however, Carter has been working closely with someone from the european office to shift through the archives records the man has left behind in his career and has been getting close.
[X][Carter]Annoy Granger for extra funding Results D45
To his own surprise Carter got a very nice email from Granger secretary, informing him that she found some leftover funds for the Orbital Fusion Project sitting around, collecting dust, and has freed them up for Space Forces general use. Carter has been seen jumping around the office, overjoyed and in a better mood in general.
(Stress -)
This Side Quest was allowed by Ithillid and is supposed to be a fun. Things happening in CarterQuest will be affected by the main one, but unless Ithillid says otherwise it is noncanon
Carters Micromanaging Adventure Q2 2052
Events:
Expand Orbital Communications Network (Phase 1)
Carter could almost not believe it once he had left the quarterly budget meeting. He had actually something to do and could use the actual good facilities and resources. Space Force would be delighted, partly at least. The commsat network was under the authority of Space Command, but not directly Space force.
Reallocate Resources to other departments, 3 dice
And the treasury had decided to share some of her wealth...finally. Carter would kiss Granger the next time he saw him, more money meant new hires...and new resources for Space Force's side projects.
(Gained 3 Free Dice, Since Carter actually has work to do, Personal Dice after the first gain him an extra + stress)
Carter Stress +
Power ++
Personnel +++++
Tiberium + Storage ++
Resources =
Advanced Parts =
Free Funding Die (FFD): D45
Free Dice: 3
Construction (5 Dice):
[ ][Carter]Build Space Force Launch Facilities Stage 1 0/100
Space Force has been sitting on their asses for months and are riled up because of Carter's constant speeches about "space" and the "final frontier". If they need to, they will build their own launch facilities. (Carter Stress++)
[ ][Carter]Storage Silos 0/50
Raw materials have been piling up and while current facilities have some storage it is limited, with current rate of harvest Tiberium Storage will be full in three months. (Adds ++++ Storage Space for Tiberium and Raw Resources)
[ ][Carter]Build Lauch Command Centre 0/100
Carter nearly forgot that he would need a dedicated launch control and command centre for orbital launches until someone reminded him. EDIT: (Personel -)
[ ][Carter]Build Tiberium Harvesting Stage 2 57/100
With some basic prefabricated harvesting facilities in place, Space Force's harvesting options are not yet exhausted. With the experience gained from the prefabs, building a dedicated industrial harvesting hub on the largest deposit available will surely be a walk in the park. (Tiberium ++, Personnel -, Power -, Carter Stress+)
[ ][Carter]Build Tiberium Processing Stage 1 69/100
Pure Tiberium is of little use, it has to be processed into raw materials. Carter's wife's brother in law has built processing plants before and still owes her a favor. (Resources +, Tiberium -, Personnel -, Carter Stress+)
[ ][Carter]Build Part Fabrication Plant Stage 1 72/100
Raw Resources are of little use most of the time, they have to be turned into usable parts. (Carter Stress+)
[ ][Carter]Build Assembly Plant Stage 2 46/100
With the building for the plant now finished and in place, the process to install the actual machinery can begin. Once finished, it can produce practically anything, though not with the speed and efficiency, for example, a dedicated computer chip factory could. (Carter Stress+, Power -, Personnel --, Enables Assembly Projects)
Personal (Unlimited Dice, but each one used here raises Carter Stress by +)
[ ][Carter]Recruitment Drives (DC 40/60/80/100)
Carter cannot do this alone. The space force personnel can follow his vision, but he needs men and women of strong will and conviction that share it. (Unlocks special npcs that give varying bonuses)
[ ][Carter]Convince the SOs (DC ??)
With much of the world still down, many of Space Force's significant others, who are not military or in construction work are still out of work. Given Carter's natural Charisma he may be able to convince them to temporarily join Space Force.
[ ][Carter]Take in interns (DC 15))
Space Force is still popular with the youth, taking in interns would boost our workforce.
[ ][Carter]Acquire Construction Vehicles 194/400
Space Force is motivated, but facilities cannot be constructed with hands alone. By scourging through GDI records Carter is sure he will find some unused vehicles rotting in a storage unit. (+20 for building facilities.)
Vote by Plan, Vote closes in 24h.