- Location
- USA
Except for once again the energy cost which requires us to do an energy project and the attendant costs for that. But yes we do want to finish that at some point just have to balance things out next year.
So less an indicator of effort involved, and more the things they want most?Even the Steel Talons don't know yet. That is why it is not specified in the blurb. They are probably going to try three or four weight classes, and see what works well enough to push forward as a finished product.
Also, the priority tags are not a be all end all of what the military branches want. They are a limited indicator of where needs effort, but it does not actually mean that those projects are the things that require maximum effort leaving no room for the other stuff. The list you see reflects the three or four highest priorities of each of the branches, and so actually everything is very important, not just the ones labeled high priority.
Yeah, I noticed the energy cost so hopefully after the next round of plants. Though if we finish tidal we could finish it with a surplus still around, though of course a bunch of stuff wants energy so it's hardly unique in wanting more power.Most naval combat against NOD is at the coasts. It's a cheap project too; 1 or 2 dice at 10R each. The only concern is if we can afford the -6 Energy. I think after we finish the next Fusion project might be the right time to do it.
We can do 3 manned missions, one is the moon base with the union leaving both leopards for manned exploration.-[X][Carter]Launch Mission: Pardus Mare Frigorus: VTOL Leopard 2
I wasn't sure if having 41 Launch capacity used would tie up the Union and one VTOL Leopard, but BOT okayed it, so I've added another.We can do 3 manned missions, one is the moon base with the union leaving both leopards for manned exploration.
we did not do any abatement or mitigation this turn. I think next one, we can get our big projects and some of that done to make up for it, as it looks like we lost ground.
I keep forgetting about the Mastadon even though it's been an available Steel Talon project since near the beginning of the game.@Ithillid for the Steel Talons plasma weapon, what platform are they thinking of putting it on? The Mastadon? Mammoth? Titan? Or will it be small enough to fit on the Havoc?
thank you. I just have not been able to find the tiberium rolls, so I did not know what to think yet.We gained ground against both Red and Yellow Zones, although due to favorable rolls more than anything. Because yes we didn't get any new points of mitigation, and even lost 2 points each of Red and Yellow mitigation. Although staying on schedule with the Stabilizer is more than worth it, and the next phase of Mecca/Jeddah will complete next turn and neatly cancel out the -2 to each we got this turn with a +2 next turn.
Quoted For Truth, because wow, the military do NOT know what is inside the mystery box of a development project, so they will NEVER prioritize those projects very highly.Even the Steel Talons don't know yet. That is why it is not specified in the blurb. They are probably going to try three or four weight classes, and see what works well enough to push forward as a finished product.
Also, the priority tags are not a be all end all of what the military branches want. They are a limited indicator of where needs effort, but it does not actually mean that those projects are the things that require maximum effort leaving no room for the other stuff. The list you see reflects the three or four highest priorities of each of the branches, and so actually everything is very important, not just the ones labeled high priority.
More or less. The military have three factors working on them here.Quoted For Truth, because wow, the military do NOT know what is inside the mystery box of a development project, so they will NEVER prioritize those projects very highly.
Looking at the turn those would be Orca refits, the Orbital Strike station, Hydrofoils, and Point Defense Refits.3. You have a lot of projects that you have developed but not deployed yet. Some of those have gotten left in the dust for years on end with no indication that you even want to work on them.
Super late in posting this, as I didn't realize @Darkandus had rolled the Tib Spread before the turn results dice. We've officially reached the point where the RZ dice is only in the 90th Percentile.
![]()
Current as of Q2 2057.
I will probably stop posting these at this point unless the results get worse; if people would rather keep seeing them let me know. I'll keep adding data because it doesn't take much effort to maintain now, but I'd say we're firmly out of the "Holy Shit that's High" Territory.
Just wanted to say that I love these.I will probably stop posting these at this point unless the results get worse; if people would rather keep seeing them let me know. I'll keep adding data because it doesn't take much effort to maintain now, but I'd say we're firmly out of the "Holy Shit that's High" Territory.
There are a few things here.I am surprised that the war factory refits are not a high priority or is that due us not having the capital goods needed to do that project?
I am definitely interested in these.Super late in posting this, as I didn't realize @Darkandus had rolled the Tib Spread before the turn results dice. We've officially reached the point where the RZ dice is only in the 90th Percentile.
![]()
Current as of Q2 2057.
I will probably stop posting these at this point unless the results get worse; if people would rather keep seeing them let me know. I'll keep adding data because it doesn't take much effort to maintain now, but I'd say we're firmly out of the "Holy Shit that's High" Territory.
For sure, I'll keep posting them then.