Here's my current plan prototype:
[] Plan Oil Roads
-[]4525/4985 Resources (460 Reserve), 46 Dice Rolled
-[]Infrastructure (12/9 Dice, 1015 R)
--[]Western USSR Regional Roads, 2 Dice (170 R)
--[]Ural Regional Roads, 4 Dice (340 R)
--[]Caucuses High Capacity Roads, 3 Dice (255 R)
--[]Caucuses Regional Roads, 1 Dice (85 R)
--[]Central Asian High Capacity Roads, 1 Dice (85 R)
--[]Power Grid Expansions, 1 Dice (80 R)
-[]Heavy Industry (5/5 Dice, 750 R)
--[]Bakchar Deposit Utilization(Stage 1), 5 Dice (750 R)
-[]Rocketry (2/2 Dice, 0 R)
--[]Approve Transfer of Venusian Funding, 1 Dice
--[]Allow Enterprise Bidding, 1 Dice
-[]Light and Chemical Industry (7/6 Dice, 960 R)
--[]Caspian Sea Petrochemical Extraction(Stage 1), 2 Dice (280 R)
--[]Samotor Field Development(Stage 1), 2 Dice (220 R)
--[]Consumer Goods Production Grants(Stage 1), 2 Dice (240 R)
--[]Self-Aligned Gate Prototypes, 1 Dice (220 R)
-[]Agriculture (6/6 Dice, 640 R)
--[]Agronomy Institutes, 1 Dice (100 R)
--[]Combined Agricultural Methodologies, 2 Dice (180 R)
--[]Third Generation Pesticides, 2 Dice (280 R)
--[]Land Control Commission, 1 Dice (80 R)
-[]Services (10/10 Dice, 1160 R)
--[]Distribution of Banking Branches, 1 Dice (80 R)
--[]Transportation Enterprises(Stage 2), 2 Dice (220 R)
--[]Legal Consulting Programs, 1 Dice (80 R)
--[]Universalization of Telephone Networking, 3 Dice (420 R)
--[]Solving the Garbage Problem, 3 Dice (360 R)
-[]Bureaucracy (4/4 Dice, 0 R)
--[]Coal-Industry Economization, 1 Dice
--[]Reorganization of Agricultural Subsidies, 1 Dice
--[]Price Loss Coverage, 1 Dice
--[]Farmer Flexibility Legislation, 1 Dice
It focuses mostly on completing the roads because we did just promise it. Throws 1 dice at the CA high-cap roads to attempt to at least do a little planning, I'm hoping to keep 1 dice/turn on them this plan and finish the Caucuses High Cap roads. To be safe, we would need an average of 10 dice on roads per turn. This turn I put 11 on roads, then next turn there will likely only be 9.
The anti-corruption campaign is at its absolute worst this turn. Next turn it should be gone which is +15, and then we also get +2 from Klim gaining more management experience. That +17 coming next turn is huge enough that we will want to put off most major expenses until then. In particular, the Sevastopol Technical Equipment Plants are direly needed but are also 300 RpD, so I'm leaning putting them off until next turn. HI will be taking multiple free dice that turn. I put 5 dice on Bakchar but that only gives a 76.6% chance of completing, so I don't put any dice on Bryansk Trucks in fear of it completing without Bakchar, which would lose us the Infra discount and completely ruin us. As long as we don't spend any steel though, we're safe for the turn.
I do, however, put one dice on the Self-Aligned Gate Prototypes because we've been previously informed that research projects like that are generally time-gated by the start date, whereas most projects are much more closely aligned with the actual progress listed. It still has a 67% chance of finishing as-is even with the massive anti-corruption penalty.
I'm not certain on the Bureaucracy options, particularly the Scientific Exchange Programs, I'm very open to arguments for other choices. I wanted Authorize Farmer-Programs, but I'm worried about the SupSov being very unhappy with that option.
edit: Swapped to Price Loss Coverage
[] Plan Oil Roads
-[]4525/4985 Resources (460 Reserve), 46 Dice Rolled
-[]Infrastructure (12/9 Dice, 1015 R)
--[]Western USSR Regional Roads, 2 Dice (170 R)
--[]Ural Regional Roads, 4 Dice (340 R)
--[]Caucuses High Capacity Roads, 3 Dice (255 R)
--[]Caucuses Regional Roads, 1 Dice (85 R)
--[]Central Asian High Capacity Roads, 1 Dice (85 R)
--[]Power Grid Expansions, 1 Dice (80 R)
-[]Heavy Industry (5/5 Dice, 750 R)
--[]Bakchar Deposit Utilization(Stage 1), 5 Dice (750 R)
-[]Rocketry (2/2 Dice, 0 R)
--[]Approve Transfer of Venusian Funding, 1 Dice
--[]Allow Enterprise Bidding, 1 Dice
-[]Light and Chemical Industry (7/6 Dice, 960 R)
--[]Caspian Sea Petrochemical Extraction(Stage 1), 2 Dice (280 R)
--[]Samotor Field Development(Stage 1), 2 Dice (220 R)
--[]Consumer Goods Production Grants(Stage 1), 2 Dice (240 R)
--[]Self-Aligned Gate Prototypes, 1 Dice (220 R)
-[]Agriculture (6/6 Dice, 640 R)
--[]Agronomy Institutes, 1 Dice (100 R)
--[]Combined Agricultural Methodologies, 2 Dice (180 R)
--[]Third Generation Pesticides, 2 Dice (280 R)
--[]Land Control Commission, 1 Dice (80 R)
-[]Services (10/10 Dice, 1160 R)
--[]Distribution of Banking Branches, 1 Dice (80 R)
--[]Transportation Enterprises(Stage 2), 2 Dice (220 R)
--[]Legal Consulting Programs, 1 Dice (80 R)
--[]Universalization of Telephone Networking, 3 Dice (420 R)
--[]Solving the Garbage Problem, 3 Dice (360 R)
-[]Bureaucracy (4/4 Dice, 0 R)
--[]Coal-Industry Economization, 1 Dice
--[]Reorganization of Agricultural Subsidies, 1 Dice
--[]Price Loss Coverage, 1 Dice
--[]Farmer Flexibility Legislation, 1 Dice
It focuses mostly on completing the roads because we did just promise it. Throws 1 dice at the CA high-cap roads to attempt to at least do a little planning, I'm hoping to keep 1 dice/turn on them this plan and finish the Caucuses High Cap roads. To be safe, we would need an average of 10 dice on roads per turn. This turn I put 11 on roads, then next turn there will likely only be 9.
The anti-corruption campaign is at its absolute worst this turn. Next turn it should be gone which is +15, and then we also get +2 from Klim gaining more management experience. That +17 coming next turn is huge enough that we will want to put off most major expenses until then. In particular, the Sevastopol Technical Equipment Plants are direly needed but are also 300 RpD, so I'm leaning putting them off until next turn. HI will be taking multiple free dice that turn. I put 5 dice on Bakchar but that only gives a 76.6% chance of completing, so I don't put any dice on Bryansk Trucks in fear of it completing without Bakchar, which would lose us the Infra discount and completely ruin us. As long as we don't spend any steel though, we're safe for the turn.
I do, however, put one dice on the Self-Aligned Gate Prototypes because we've been previously informed that research projects like that are generally time-gated by the start date, whereas most projects are much more closely aligned with the actual progress listed. It still has a 67% chance of finishing as-is even with the massive anti-corruption penalty.
edit: Swapped to Price Loss Coverage
Last edited: