Vote closed
Shadows
Sacred Priestess of the Benevolent Dice Gods
- Location
- USS Civilian, DDG-214
- Pronouns
- She/Her
Adhoc vote count started by Shadows on Feb 13, 2024 at 2:36 PM, finished with 43 posts and 13 votes.
-
-
-
[X] Plan: (Lightly) Inflated & Ready for Launch
-[X] Construct an R-4 Dawn (35R per dice, 69/120, costs 1 build capacity til complete) (3 dice)
--[X] And launch it (1 Operations dice; specify payload) (2 dice)
---[X] Sounding payload (inert payload for testing)
---[X] Advanced latex envelope (spare weather balloon) inflated via technologically-mature capillary action-delayed release fluid reservoir (a fountain pen full of water with a notch cut out of the cap) as an orbital payload mass simulator
-[X] Build a Scientific Complex (25R per die)
--[X] Sao Paolo Aerodynamics Centre (AERO) [CPAL, Int(C)] (425/450) (1 Die )
--[X] Long Beach Propulsion Research Complex (PROP) [Int(D),UWF] (293/450) (3 Dice
--[X] Mombasa Computer Science Institute (COMP) [CPAL] (273/450) (3 Dice)
-[X] Tracking Station Construction (Phase I) (30R per die, 183/350) (1 die)
-[X] Conduct Design Studies (First Satellite) (Phase II) [PHYS, FUEL, COMP] (15R per dice, 2/200) (5 dice)
-[X] Conduct Supersonic Jet Research (Phase 2) [AERO] (15R per die, 167/320) (3 dice)
-[X] Weather Studies (Phase 4) [PHYS] (10R per die, 118/240) (1 die)
-[X] Propagandize for Nuclear Power (-2PS per die) (0/???) (2 dice)
-[X] Accepting Submissions (1 die)
-
-
[X] Plan Satellite Rush
-[X] Construct an R-4 Dawn - (35RPD, 69/120) 1 die 35R 53%
-[X] Launch R-4 Dawn - 1 die
--[X] [Payload] First Satellite if completed, or sounding payload
-[X] Build a Scientific Complex - (25RPD, 0/450 each)
--[X] Sao Paolo Aerodynamics Centre - (425/450) 1 die 25R 86%
--[X] Long Beach Propulsion Research Complex - (293/450) 3 dice 75R 68%
--[X] Mombasa Computer Science Institute - (273/450) 3 dice 75R 54%
-[X] Tracking Station Construction (Phase I) - (30RPD, 183/350) 1 die 30R
-[X] Conduct Design Studies (First Satellite) (Phase II) [PHYS, FUEL, COMP] - (15RPD, 2/200) 5 dice 75R 98%
-[X] Conduct Supersonic Jet Research (Phase 2) [AERO] - (15RPD, 167/240?) 4 dice 60R 97%
-[X] Creative Sponsorships - (10RPD, 141/400) 2 dice 20R
-[X] The Right Stuff - (5RPD, 0/300) 1 die 5R
-
-
[X] Plan: Satellites and Science
-[X] Construct an R-3 Snow - (25R per dice, 7/80, costs 1 Build Capacity until complete) (3 Die)
--[X] And launch everything except one of the Dawns (1 Operations dice; specify payload) (2 dice)
---[X] Sounding payload (inert payload for testing)
---[X] Advanced latex envelope (spare weather balloon) inflated via technologically-mature capillary action-delayed release fluid reservoir (a fountain pen full of water with a notch cut out of the cap) as an orbital payload mass simulator
-[X] Build a Scientific Complex (25R per die, opens up new research possibilities, +1d5+5 bonus in the associated field, +1 Education for the region)
--[X] Sao Paolo Aerodynamics Centre (AERO) [CPAL, Int(C)] (425/450) (1 Die )
--[X] Long Beach Propulsion Research Complex (PROP) [Int(D),UWF] (293/450) (3 Dice
--[X] Mombasa Computer Science Institute (COMP) [CPAL] (273/450) (3 Dice)
-[X] Tracking Station Construction (Phase I)(30R per die, 183/350, adds equatorial tracking for rocket launches) (1 Die)
-[X] Conduct Design Studies (First Satellite) (Phase I) [PHYS, FUEL, COMP] (Phase II, 15R per dice) (2/200) <- Construction of prototype complete (unlocks First-Generation Science Satellite) (4 Dice)
-[X] Conduct Design Studies (Alternative Launch Systems) [AERO, PHYS] (5R per die, 177/300, ???) (1 Dice)
-[X] Conduct Supersonic Jet Research (Phase 2) [AERO] - (15R per die, requires a completed Hangar Complex and Runway to finish, can be started without, 167/320) (3 Dice)
-[X] Weather Studies (Phase 4) [PHYS] - (10R per die, requires a 2-Stage Sounding Rocket, requires Mobile Launch Operations, 118/240) (+5 PS on complete) (1 Die)
-[X] Propagandize for Space - (5R per die) (0/???) (1 Dice)
-[X] The Right Stuff - (0/300, 5R per dice, gain astronaut candidates) (2 dice)
-
-
[X] Plan: Go For Launch.
-[X] Construct an R-4 Dawn (35R per dice, 69/120, costs 1 build capacity til complete) (3 dice)
--[X] And launch it (1 Operations dice; specify payload) (2 dice)
---[X] Sounding payload (inert payload for testing)
---[X] Standby for Orbital Payload Launch (if satellite completes, have a rocket ready to mate with it ASAP, launch promptly before the end of the quarter)
-[X] Build a Scientific Complex (25R per die)
--[X] Sao Paolo Aerodynamics Centre (AERO) [CPAL, Int(C)] (425/450) (1 Die )
--[X] Long Beach Propulsion Research Complex (PROP) [Int(D),UWF] (293/450) (3 Dice
--[X] Mombasa Computer Science Institute (COMP) [CPAL] (273/450) (3 Dice)
-[X] Tracking Station Construction (Phase I) (30R per die, 183/350) (1 die)
-[X] Conduct Design Studies (First Satellite) (Phase II) [PHYS, FUEL, COMP] (15R per dice, 2/200) (5 dice)
-[X] Conduct Supersonic Jet Research (Phase 2) [AERO] (15R per die, 167/320) (3 dice)
-[X] Weather Studies (Phase 4) [PHYS] (10R per die, 118/240) (1 die)
-[X] Propagandize for Nuclear Power (-2PS per die) (0/???) (2 dice)
-[X] Accepting Submissions (1 die)
-
Should be fixed.
E: ignore the 83 on nuclear, rerolled one too many times.
Last edited: