[X] Plan Before the Hurricane Season
[X] [SNPR] Defer the decision until a later date.
 
Vote closed
Scheduled vote count started by Shadows on Jun 27, 2024 at 10:22 AM, finished with 6 posts and 6 votes.

  • [X] Plan Before the Hurricane Season
    -[X] Construct an R-4 Dawn (97/120) (1 die, -35R)
    --[X] And Launch it x2 dice
    ---[X] With a Curiosity-C weather satellite x2
    ----[X] Covering Asia& North America
    ----[X] Covering South America
    -[X] Construct a Payload 1 die
    --[X] Curiosity-B class photo-return satellite -25R
    -[X] Build a Space Center (Singapore) (33/600) (3 dice, -105R)
    -[X] Build a Scientific Complex
    --[X] Sydney Microelectronics Research Centre (AVIONICS) (133/450) (2 dice, -50R)
    -[X] Tracking and Communication Station Construction (Phase 3) (75/550) (3 dice, -90R)
    -[X] Human-rated Rocketry (6/8 turns) (1 die, -20R)
    -[X] Lifting Body (30/150)(2 dice, -20R)
    -[X] Nuclear Power Plant Design Studies (5/8 turns) (1 die, -25R)
    -[X] Multi-Stage Designs (1/2 turns) (1 die, -15R)
    -[X] Impactor Designs (1/3 turns) (1 die, -10R)
    -[X] Exploratory Propellant Research (Phase 2) [CHEM] (29/250) (2 dice, -30R)
    -[X] Very Long Range Communications (0/3 turns) (1 die, -5 R)
    -[X] Transistor Computing Investigations (1/6 turns) (1 die, -20R)
    -[X] Closed-Input Life Support Systems (126/200) (1 die, -10R)
    -[X] Propagandize for Nuclear Power (312/???) (2 dice, -4PS)
    -[X] Visitor Complex (0/300) (3 dice, -30R)
    [X] [SNPR] Defer the decision until a later date.
 
Scheduled vote count started by Shadows on Jun 27, 2024 at 10:22 AM, finished with 6 posts and 6 votes.

  • [X] Plan Before the Hurricane Season
    -[X] Construct an R-4 Dawn (97/120) (1 die, -35R)
    --[X] And Launch it x2 dice
    ---[X] With a Curiosity-C weather satellite x2
    ----[X] Covering Asia& North America
    ----[X] Covering South America
    -[X] Construct a Payload 1 die
    --[X] Curiosity-B class photo-return satellite -25R
    -[X] Build a Space Center (Singapore) (33/600) (3 dice, -105R)
    -[X] Build a Scientific Complex
    --[X] Sydney Microelectronics Research Centre (AVIONICS) (133/450) (2 dice, -50R)
    -[X] Tracking and Communication Station Construction (Phase 3) (75/550) (3 dice, -90R)
    -[X] Human-rated Rocketry (6/8 turns) (1 die, -20R)
    -[X] Lifting Body (30/150)(2 dice, -20R)
    -[X] Nuclear Power Plant Design Studies (5/8 turns) (1 die, -25R)
    -[X] Multi-Stage Designs (1/2 turns) (1 die, -15R)
    -[X] Impactor Designs (1/3 turns) (1 die, -10R)
    -[X] Exploratory Propellant Research (Phase 2) [CHEM] (29/250) (2 dice, -30R)
    -[X] Very Long Range Communications (0/3 turns) (1 die, -5 R)
    -[X] Transistor Computing Investigations (1/6 turns) (1 die, -20R)
    -[X] Closed-Input Life Support Systems (126/200) (1 die, -10R)
    -[X] Propagandize for Nuclear Power (312/???) (2 dice, -4PS)
    -[X] Visitor Complex (0/300) (3 dice, -30R)
    [X] [SNPR] Defer the decision until a later date.
Honestly didn't realize voting had opened. Not that it would have changed much.
 
If people want me to set a new vote end date let me know. 5 votes is kinda... yeah.
 
[X] Plan Before the Hurricane Season

I'm pretty much just lurking and have no real idea what I'm doing, but I know lack of participation can be discouraging for a GM, so have a vote. :)
 
[X] Plan Before the Hurricane Season
[X] [SNPR] Defer the decision until a later date.
 
Yeah, where IS everyone? Last time this quest updated after a pause, the crowd came back quick.
I think it's a mix of people being busy and not much happening to vote on. There's a plan, it's pretty decent, not much more to say. Next quarter is when we probably start hitting panic buttons on unfulfilled promises and debates start happening, I think? It's just a quiet period with how much we've promised.

As a general note, we should probably promise less, just so we have more latitude to debate during the "year".
 
[X] Plan Before the Hurricane Season
[X] [SNPR] Defer the decision until a later date.
Honestly I just lurk really hard sometimes and participate others. But here is some votes, I do care about this quest, I just read as many as I possibly can so I don't have energy to participate a lot of the time. I do love this quest though.
 
Adhoc vote count started by Shadows on Jul 2, 2024 at 12:20 PM, finished with 39 posts and 13 votes.

  • [X] Plan Before the Hurricane Season
    -[X] Construct an R-4 Dawn (97/120) (1 die, -35R)
    --[X] And Launch it x2 dice
    ---[X] With a Curiosity-C weather satellite x2
    ----[X] Covering Asia& North America
    ----[X] Covering South America
    -[X] Construct a Payload 1 die
    --[X] Curiosity-B class photo-return satellite -25R
    -[X] Build a Space Center (Singapore) (33/600) (3 dice, -105R)
    -[X] Build a Scientific Complex
    --[X] Sydney Microelectronics Research Centre (AVIONICS) (133/450) (2 dice, -50R)
    -[X] Tracking and Communication Station Construction (Phase 3) (75/550) (3 dice, -90R)
    -[X] Human-rated Rocketry (6/8 turns) (1 die, -20R)
    -[X] Lifting Body (30/150)(2 dice, -20R)
    -[X] Nuclear Power Plant Design Studies (5/8 turns) (1 die, -25R)
    -[X] Multi-Stage Designs (1/2 turns) (1 die, -15R)
    -[X] Impactor Designs (1/3 turns) (1 die, -10R)
    -[X] Exploratory Propellant Research (Phase 2) [CHEM] (29/250) (2 dice, -30R)
    -[X] Very Long Range Communications (0/3 turns) (1 die, -5 R)
    -[X] Transistor Computing Investigations (1/6 turns) (1 die, -20R)
    -[X] Closed-Input Life Support Systems (126/200) (1 die, -10R)
    -[X] Propagandize for Nuclear Power (312/???) (2 dice, -4PS)
    -[X] Visitor Complex (0/300) (3 dice, -30R)
    [X] [SNPR] Defer the decision until a later date.
Shadows threw 1 100-faced dice. Reason: R-4 Construction Total: 97
97 97
Shadows threw 2 100-faced dice. Reason: R-4 Launch Total: 120
66 66 54 54
Shadows threw 2 100-faced dice. Reason: Satellite Deployments Total: 91
14 14 77 77
Shadows threw 3 100-faced dice. Reason: Space Center Construction Total: 239
80 80 94 94 65 65
Shadows threw 2 100-faced dice. Reason: Sydney Microelectronics Total: 82
55 55 27 27
Shadows threw 3 100-faced dice. Reason: Tracking Station Construction Total: 183
89 89 64 64 30 30
Shadows threw 2 100-faced dice. Reason: Lifting Body Total: 131
33 33 98 98
Shadows threw 2 100-faced dice. Reason: Exploratory Prop Research Total: 84
25 25 59 59
Shadows threw 1 100-faced dice. Reason: CILSS Total: 75
75 75
Shadows threw 2 100-faced dice. Reason: Propagandize for Nuclear Power Total: 153
65 65 88 88
Shadows threw 4 100-faced dice. Reason: Visitor Center Construction Total: 281
86 86 57 57 54 54 84 84
 
Ops
Construct an R-4 (97/120) - (97+97+3) = 120/120 + 77/120
Launch 1 (66); Satellite 1 (14) (NA & Asia)
Launch 2 (54); Satellite 2 (77) (SA)
Facilities
Singapore Space Center II (33/600) - (33+239+30) = 302/600
Sydney Scientific Complex (133/450) - (133+82+20) = 235/450
Tracking Stations III (75/550) - (75+183+30) = 288/450

Engineering
Human-rated Rocketry ☑☑☑☑☑☑☑◻
Lifting Body (30/150) - (30+131+18) = 179/150
NPP Design Studies ☑☑☑☑☑☑◻◻
Multi-Stage Designs ☑☑
Impactor Designs ☑☑◻
Science
Exploratory Propellant Research II (29/250) - (29+84+54) = 167/250
VLR Communications ☑◻◻
Transistor Computing Investigations ☑☑◻◻◻◻

Closed-Input LSS (126/200) - (126+75+9) = 210/200
Politics
Propagandize for Nuclear Power (312/???) - (312+153+20) = 485/???
Visitor Complex (0/300) - (0+227+30) = 257/300
 
Plan Before the Hurricane Season
Construct an R-4 Dawn (97+100=197/120->77/120) (1 die, -35R)
--[X] And Launch it x2 dice
---[X] With a Curiosity-C weather satellite x2
----[X] Covering Asia& North America 66->14 (Failure to operate satelite, stuck valve leads to unctonrolled tumble)
----[X] Covering South America 54-> 77 (Successful Orbit achieved, satelite operational)
-[X] Construct a Payload 1 die
--[X] Curiosity-B class photo-return satellite -25R
-[X] Build a Space Center (Singapore) (33+269=302/600) (3 dice, -105R)
-[X] Build a Scientific Complex
--[X] Sydney Microelectronics Research Centre (AVIONICS) (133+102=235/450) (2 dice, -50R)
-[X] Tracking and Communication Station Construction (Phase 3) (75+213=288/550) (3 dice, -90R)

-[X] Human-rated Rocketry (7/8 turns) (1 die, -20R)
-[X] Lifting Body (30+131+18=179/150)(2 dice, -20R)
-[X] Nuclear Power Plant Design Studies (6/8 turns) (1 die, -25R)
-[X] Multi-Stage Designs (2/2 turns) (1 die, -15R)
-[X] Impactor Designs (2/3 turns) (1 die, -10R)
-[X] Exploratory Propellant Research (Phase 2) [CHEM] (29+84+54=167/250) (2 dice, -30R)
-[X] Very Long Range Communications (1/3 turns) (1 die, -5 R)
-[X] Transistor Computing Investigations (2/6 turns) (1 die, -20R)

-[X] Closed-Input Life Support Systems (126+75+9=210/200) (1 die, -10R)
-[X] Propagandize for Nuclear Power (312+173=485/???) (2 dice, -4PS)
-[X] Visitor Complex (257/300) (3 dice, -30R)


Yeah, not a bad turn overall.
 
We need to throw all our dice into all-sky survey in Q4, it'll be the traditional end-of-year stargazing expedition-slash-winter holiday vacation!
 
Back
Top