Vote tally - A Sword Without a Hilt: A Song of Ice and Fire/D&D 3.5 Crossover

Adhoc vote count started by DragonParadox on May 1, 2021 at 1:30 PM, finished with 63 posts and 12 votes.

Tally configuration

Simple majority
DragonParadox
A Sword Without a Hilt: A Song of Ice and Fire/D&D 3.5 Crossover
Post #436490
Post #436552

Block
Yes
Enabled
Enabled
Enabled
Enabled
12
63

  • [X] Plan Totally Ripped Off From @Azel's Notes
    -[X] In Westeros:
    --[X] The King's Road will be upgraded to Imperial standards to serve as a backbone for all further road building efforts in Westeros.
    ---[X] From the King's Road in the North, arterial highways will be constructed to connect to Winterfell, White Harbor, the Dreadlands, and the Wall. The land is massive yet severely underpopulated, so the sooner we lay the groundwork for additional infrastructure which will encourage immigration and increased trade, the better.
    ---[X] From the King's Road in the Vale, arterial highways will be constructed to connect to Gulltown, Northweald, the Eyrie, and the eastern coastline, and for much the same reasons as our efforts in the North.
    --[X] A network of highways will be constructed in Dorne to take advantage of the recently completed bridge reconnecting Essos with Westeros via the Arm of Dorne, including connections through the Prince's Pass toward the central Reach, through Wyl towards Storms End, and crossing the Torentine towards Oldtown.
    --[X] A canal or channel will be cut between Seaguard and the Twin, along with widening the tributaries of the Blue Fork to allow it to reach all the way to the coast. This will create a navigable water route across the continent, linking the Sunset and Narrow Seas.
    --[X] Construction will begin on the core of a trade city with adjoining river harbor near the Twins, along with expanding the harbor of Saltpans.
    -[X] In Essos and the Stepstones:
    --[X] The previously laid tracks included in most of our road building projects in the Stepstones and western Essos will be made ready for train service. Construction of steam-powered trains using previously developed technology will begin. The train service isn't expected to begin running any time soon, but once it does enter service, it will greatly increase the flow of goods throughout the continent, especially bulk items, such as the foodstuffs grown in the former Disputed Lands.
    ---[X] To occur jointly with the development of the larger steam-powered trains intended to greater cargo and longer hauls, smaller trams and trains will be constructed and put into service in and around Sorcerer's Deep. This is not only intended to further improve the quality of life for those who live in our capital, but also as a showcase to begin familiarizing citizens with the new technology which will eventually become more commonplace throughout the Imperium.
Back
Top